The bathroom is a room with specific requirements: high humidity, temperature differences. That’s why making fixes in the bathroom, you need to definitely plan the entire working process, to consider the sequence of steps to be performed. In this guide, you will discover the way to start the fix in the bathroom and what kinds of work should be carried out together with your hands. Step-by-step instructions for bathroom repair

Phase 1: Establishing a plan and deciding upon a layout solution.

Fix in the bathroom can be of 2 types:

  • Unplanned, spontaneous, originating from the will of unforeseen conditions. By way of instance, in case of an pipe burst, flooding by neighbors.
  • Planned, that is either cosmetic or capital. It requires preparation, serious fiscal investment and time.

Begin repairs in the toilet is to determine the plan, interior. Think through to the last detail, what’s going to be the space, select a colour. Pastel colors are traditional, as well as a combination of blue and blue, pink or cherry with beige.

Begin repairs in the bathroom is to ascertain the plan, interior design. Consider detail, what will be the room, select a color. Pastel colours are deemed traditional, in addition to a mixture of colors.

The next point is that the choice of facing material. Usually, finishing at the toilet is performed with tile, porcelain tiles, mosaic, plastic panels. Examine the plumbing, whether it has to be mended. If necessary, select the right alternative. Proceed to the measuring work: quantify all sides, figure out the area of the area. Based on these information, we indicate the location of the plumbing fixtures.

Step 2: the choice of sanitary fixtures and material for finishing.

It is crucial to understand that the purchase of sanitary ware precedes the planning stage, and not vice versa. This means that first we develop a new design project, make a plan, then go to the store. Another point – you need to specify the size of your favourite plumbing fittings and check the plan, whether it matches.

It’s very important to understand that the purchase of plumbing fittings is completed by a preparation phase, rather than vice versa. This usually means that first we create a design project, create a plan, then go to the store. Another one

In terms of materials for completing, it’s better to buy them instantly for the whole repair cycle, so that you won’t be distracted if something was missing. Do not forget about preparing the vital tools.

Step 3: dismantling tiling and plumbing.

Once All of the preliminary work is completed, move on to the Start of the work process:

  • Remove the sink and tub from the area, even if they will not be replaced with new ones. In this way, you can keep them clean and intact.
  • Remove the tile, cleaning after it all surfaces: walls, ceiling, floor.
  • Remove paint from the walls, if they had been formerly painted, because the adhesive solution or a new layer of paint won’t adhere to surface.

Step 4: replacement of communications: pipes, electric wiring.

Very often in an old house, you ought to carefully inspect and replace not just the pipes that are in the bathroom itself, but in addition the principal riser, and sometimes the interfloor pipes. What’s it worth doing so? Old pipes anytime can give a flow, and then the new repair will be spoiled, it will call vsyakuhnya.ru for additional investment to eliminate defects.